7824 Mukilteo Speedway
PO Box 260
Mukilteo, WA  98275
425-355-3355
 

 

Big Gulch Sanitary Sewer Reconstruction Project
A Brief Historical Overview

Resulting Damages

In the years since the construction of the original sewer trunk line, the stormwater from the many winter high flow storm events was eroding the soil and transporting it down the gulch to Puget Sound. Although this natural transport of the stream bed gravel and soils is considered very beneficial, what was hidden from view was that the larger stormwater flows were slowly scouring the protective soil cover from over the pipeline, and from the gulch sidewalls.

Next...

Site by Ed-Web Design, Inc.